Date: 21/08/2025 06:44:50
ID: 0
ID Visitor: 68a6c06225bc7
IP Visitor: 216.73.216.175
Type: Warning [2]
Message: Undefined array key "HTTP_ACCEPT_LANGUAGE"
File: /home/kiaparks/public_html/class/app.php
Line: 997
URL: https://www.kiaparks.com/peru?lang=en

Date: 21/08/2025 06:44:50
ID: 0
ID Visitor: 68a6c06225bc7
IP Visitor: 216.73.216.175
Type: Unknown [8192]
Message: substr(): Passing null to parameter #1 ($string) of type string is deprecated
File: /home/kiaparks/public_html/class/app.php
Line: 997
URL: https://www.kiaparks.com/peru?lang=en

Date: 21/08/2025 06:44:50
ID: 0
ID Visitor: 68a6c06225bc7
IP Visitor: 216.73.216.175
Type: Warning [2]
Message: Cannot modify header information - headers already sent by (output started at /home/kiaparks/public_html/class/app.php:673)
File: /home/kiaparks/public_html/class/app.php
Line: 1039
URL: https://www.kiaparks.com/peru?lang=en

Peru | Kia Parks

Kia Parks Lima, Peru
Puericultorio Pérez Araníbar

Before
After

Learn more of our space

The Pérez Araníbar Puericultorio Project in Peru aims to change the lives of more than 120 abandoned children by remodeling the recreation and sports area. The space being renovated in Lima is the Puericultorio Pérez Araníbar, which is over 200 years old. It is a care center run by the children's charity with outdoor spaces where they can play, run and do outdoor activities.

Our commitment is to create a better and sustainable future as a brand. We are creating harmony with nature, communities, and sustainability.

Kia
Watch video

The construction of the project took about one month. The movement of these children inspires us to support their growth.

Rehabilitated Areas:

  • Soccer fields
  • Multidisciplinary Courts (Football and Basketball)
  • Volleyball courts
  • Playgrounds (3)
  • Central Building
  • Buldings around the area

Before

Soccer field

The main soccer field was heavily worn and lacking in maintenance.

Multidisciplinary Courts

The cement courts showed wear and other damages, such as holes and completely rusted elements.

Playgrounds

The playground was found in terrible conditions where the children played on the ground, and wooden and metal structures with a lot of wear.

Playgrounds

Also, the central building showed a lack of maintenance.

Central Building

As the main one, the auxiliary court showed a lot of wear on the synthetic grass.

Buldings around the area

The adjoining buildings also present a lack of maintenance.


After

Soccer field

The floor of the soccer field was entirely replaced by new synthetic grass.

Central Building

We did external remodeling work on the building in front of the pitch.

Multidisciplinary Courts

All the cracks and holes in the sports tile were patched up. The court was painted eco-friendly, and new stainless steel basketball hoops and goals were made.

Playgrounds

New synthetic grass was placed throughout the playground area. Likewise, new games for children were set, and complete maintenance was given to the current games. In addition, the entire main building in the intervened area was remodeled and repaired.

Playgrounds

New synthetic grass was placed throughout the playground area. Likewise, new games for children were set, and complete maintenance was given to the current games. In addition, the entire main building in the intervened area was remodeled and repaired.

Volleyball Courts

The synthetic grass of the auxiliary field was utterly changed, and a fence was placed for the safety of the children. A new net was included to practice volleyball.